Which, once commissioned, would constitute by far the world’s biggest renewable energy projects by installed capacity in Saudi Arabia.
The objective of ILF’s assignment is to provide world-class engineering services for the parks to reach a development maturity ready for tendering on an IPP basis.
The report mentioned pre-development studies, which include:
Preliminary site assessment, master plan, environmental baseline surveys, environmental and social impact assessment (ESIA), Permitting, Studies including geotechnical, hydrological, glint/glare, and corrosion Energy yield assessment, technology selection, and CAPEX/OPEX estimate
Reporting on Pltheuses' advanced design for the park report mentioned, the projects are part of the most ambitious and prestigious developments globally in terms of sustainability, innovation, and technological vanguard.
"A key puzzle piece in Saudi Arabia’s Vision 2030 strategy to be a world champion in renewable energies by 2030, a perfect match with ILF’s commitment to climate protection and vision statement of "improving quality of life," "statement" mentioned